I did it this way with the inner panels to reduce the use of a lot of tubing, there's some tubing as you can see in the roof area and in the b-pillars, a-pillars are welded flat material cut to shape and welded together then drilled for the covers and weld nuts welded to the back side to attach the cover, I have pictures of those if I can find them.